{"id":16570,"date":"2024-08-16T16:45:00","date_gmt":"2024-08-16T20:45:00","guid":{"rendered":"https:\/\/blogarchive.utc.edu\/campus-weekly\/?p=16570"},"modified":"2024-08-17T09:17:03","modified_gmt":"2024-08-17T13:17:03","slug":"fall-semester-construction-activities-3","status":"publish","type":"post","link":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/","title":{"rendered":"Fall Semester Construction Activities"},"content":{"rendered":"<p>Greetings campus community!\u00a0 I would like to make you aware of some construction activities that you may encounter on campus this semester.<\/p>\n<p><strong><u>Pedestrian Way Between ARC and 5<sup>th<\/sup> Street Garage:<\/u><\/strong><\/p>\n<p>The pedestrian path between the ARC and the 5<sup>th<\/sup> Street Garage will be closed soon for upgrades to our campus electrical distribution system.\u00a0 The upgrades are needed to improve reliability and redundancy.\u00a0 The work is expected to be completed by the end of next summer.\u00a0 Signage directing pedestrians to alternate paths will be installed.<\/p>\n<p><strong><u>University Center Renovation:<\/u><\/strong><\/p>\n<p>A project to renovate much of the University Center will begin soon.\u00a0 The project will be phased to minimize the impact on the campus community. \u00a0\u00a0Directional signage will be installed to assist with wayfinding during construction.<\/p>\n<p><strong><u>Brock Hall Renovation:<\/u><\/strong><\/p>\n<p>A project is underway to renovate Brock Hall.\u00a0 The building will be offline until the fall semester of 2025.<\/p>\n<p><strong><u>540 McCallie (CSOB) Renovation:<\/u><\/strong><\/p>\n<p>A project to renovate much of the 540 Bldg. will begin soon.\u00a0 The project will replace critical building envelope features (roof, windows, etc.), replace building systems (i.e. HVAC, electrical, elevators, plumbing, etc.), and renovate some interior spaces.<\/p>\n<p><strong><u>Fletcher Hall Addition:<\/u><\/strong><\/p>\n<p>A project to expand Fletcher Hall will begin soon.\u00a0 The initial phase of the project will relocate existing underground utilities to accommodate the building construction.\u00a0 There will be some street closures near the intersection of Douglas and Oak Streets.\u00a0 There will also be some rerouting of pedestrian traffic in the area.\u00a0 As those plans are finalized, they will be shared with the campus.<\/p>\n<p><strong><u>Health Sciences Building:<\/u><\/strong><\/p>\n<p>A new Health Sciences Building will be constructed near the intersection of Palmetto and 3<sup>rd<\/sup> Streets. \u00a0Some parking in the area will be affected and Parking Services will communicate those to campus as the planning is completed.<\/p>\n<p><strong><u>McKenzie Arena:<\/u><\/strong><\/p>\n<p>The Wolford Family Athletic Center addition to McKenzie Arena has dramatically improved the main entrance to campus.\u00a0 The new addition and renovation spaces are now fully occupied.\u00a0 There is additional work underway that will install exterior digital displays above Gates 1 &amp; 3.<\/p>\n<p><strong>Danny West, LEED AP<\/strong><\/p>\n<p>Director of Construction Services<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Greetings campus community!\u00a0 I would like to make you aware of some construction activities that you may encounter on campus this semester. Pedestrian Way Between ARC and 5th Street Garage: The pedestrian path between the ARC and the 5th Street Garage will be closed soon for upgrades to our campus electrical distribution system.\u00a0 The upgrades&hellip; <\/p>\n<p class=\"more-link-wrap\"><span><a class=\"more-link button text\" href=\"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/\"><span>Continue Reading <\/span><\/a><\/span><\/p>\n","protected":false},"author":1493,"featured_media":16571,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[8,15,120183,120186],"tags":[],"class_list":{"0":"post-16570","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-campus","8":"category-faculty-staff","9":"category-news","10":"category-students-news","11":"entry"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Fall Semester Construction Activities - Campus Updates Archive<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Fall Semester Construction Activities - Campus Updates Archive\" \/>\n<meta property=\"og:description\" content=\"Greetings campus community!\u00a0 I would like to make you aware of some construction activities that you may encounter on campus this semester. Pedestrian Way Between ARC and 5th Street Garage: The pedestrian path between the ARC and the 5th Street Garage will be closed soon for upgrades to our campus electrical distribution system.\u00a0 The upgrades&hellip; Continue Reading\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/\" \/>\n<meta property=\"og:site_name\" content=\"Campus Updates Archive\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-16T20:45:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-17T13:17:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blogarchive.utc.edu\/campus-weekly\/files\/2024\/08\/Chamberlain-Pavilion-22-752.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2400\" \/>\n\t<meta property=\"og:image:height\" content=\"1597\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Chuck Wasserstrom\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Chuck Wasserstrom\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/\"},\"author\":{\"name\":\"Chuck Wasserstrom\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/#\\\/schema\\\/person\\\/ba12ddef664be78c31809fda10eae4e5\"},\"headline\":\"Fall Semester Construction Activities\",\"datePublished\":\"2024-08-16T20:45:00+00:00\",\"dateModified\":\"2024-08-17T13:17:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/\"},\"wordCount\":345,\"image\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/files\\\/2024\\\/08\\\/Chamberlain-Pavilion-22-752.jpg\",\"articleSection\":[\"Campus\",\"Faculty\\\/Staff\",\"News\",\"Students\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/\",\"name\":\"Fall Semester Construction Activities - Campus Updates Archive\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/files\\\/2024\\\/08\\\/Chamberlain-Pavilion-22-752.jpg\",\"datePublished\":\"2024-08-16T20:45:00+00:00\",\"dateModified\":\"2024-08-17T13:17:03+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/#\\\/schema\\\/person\\\/ba12ddef664be78c31809fda10eae4e5\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/files\\\/2024\\\/08\\\/Chamberlain-Pavilion-22-752.jpg\",\"contentUrl\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/files\\\/2024\\\/08\\\/Chamberlain-Pavilion-22-752.jpg\",\"width\":2400,\"height\":1597},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/2024\\\/08\\\/fall-semester-construction-activities-3\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Fall Semester Construction Activities\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/#website\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/\",\"name\":\"Campus Updates Archive\",\"description\":\"What you should know for the week\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/#\\\/schema\\\/person\\\/ba12ddef664be78c31809fda10eae4e5\",\"name\":\"Chuck Wasserstrom\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/adff2964e628ba03f65fe21e0b0b94ca0667bdce5def0433d41884758501f284?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/adff2964e628ba03f65fe21e0b0b94ca0667bdce5def0433d41884758501f284?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/adff2964e628ba03f65fe21e0b0b94ca0667bdce5def0433d41884758501f284?s=96&d=mm&r=g\",\"caption\":\"Chuck Wasserstrom\"},\"description\":\"Chuck Wasserstrom is the director of communications in the UTC Division of Communications and Marketing.\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/campus-weekly\\\/author\\\/wyf557\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Fall Semester Construction Activities - Campus Updates Archive","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Fall Semester Construction Activities - Campus Updates Archive","og_description":"Greetings campus community!\u00a0 I would like to make you aware of some construction activities that you may encounter on campus this semester. Pedestrian Way Between ARC and 5th Street Garage: The pedestrian path between the ARC and the 5th Street Garage will be closed soon for upgrades to our campus electrical distribution system.\u00a0 The upgrades&hellip; Continue Reading","og_url":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/","og_site_name":"Campus Updates Archive","article_published_time":"2024-08-16T20:45:00+00:00","article_modified_time":"2024-08-17T13:17:03+00:00","og_image":[{"width":2400,"height":1597,"url":"https:\/\/blogarchive.utc.edu\/campus-weekly\/files\/2024\/08\/Chamberlain-Pavilion-22-752.jpg","type":"image\/jpeg"}],"author":"Chuck Wasserstrom","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Chuck Wasserstrom","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/#article","isPartOf":{"@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/"},"author":{"name":"Chuck Wasserstrom","@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/#\/schema\/person\/ba12ddef664be78c31809fda10eae4e5"},"headline":"Fall Semester Construction Activities","datePublished":"2024-08-16T20:45:00+00:00","dateModified":"2024-08-17T13:17:03+00:00","mainEntityOfPage":{"@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/"},"wordCount":345,"image":{"@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/#primaryimage"},"thumbnailUrl":"https:\/\/blogarchive.utc.edu\/campus-weekly\/files\/2024\/08\/Chamberlain-Pavilion-22-752.jpg","articleSection":["Campus","Faculty\/Staff","News","Students"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/","url":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/","name":"Fall Semester Construction Activities - Campus Updates Archive","isPartOf":{"@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/#primaryimage"},"image":{"@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/#primaryimage"},"thumbnailUrl":"https:\/\/blogarchive.utc.edu\/campus-weekly\/files\/2024\/08\/Chamberlain-Pavilion-22-752.jpg","datePublished":"2024-08-16T20:45:00+00:00","dateModified":"2024-08-17T13:17:03+00:00","author":{"@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/#\/schema\/person\/ba12ddef664be78c31809fda10eae4e5"},"breadcrumb":{"@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/#primaryimage","url":"https:\/\/blogarchive.utc.edu\/campus-weekly\/files\/2024\/08\/Chamberlain-Pavilion-22-752.jpg","contentUrl":"https:\/\/blogarchive.utc.edu\/campus-weekly\/files\/2024\/08\/Chamberlain-Pavilion-22-752.jpg","width":2400,"height":1597},{"@type":"BreadcrumbList","@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/2024\/08\/fall-semester-construction-activities-3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogarchive.utc.edu\/campus-weekly\/"},{"@type":"ListItem","position":2,"name":"Fall Semester Construction Activities"}]},{"@type":"WebSite","@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/#website","url":"https:\/\/blogarchive.utc.edu\/campus-weekly\/","name":"Campus Updates Archive","description":"What you should know for the week","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogarchive.utc.edu\/campus-weekly\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogarchive.utc.edu\/campus-weekly\/#\/schema\/person\/ba12ddef664be78c31809fda10eae4e5","name":"Chuck Wasserstrom","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/adff2964e628ba03f65fe21e0b0b94ca0667bdce5def0433d41884758501f284?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/adff2964e628ba03f65fe21e0b0b94ca0667bdce5def0433d41884758501f284?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/adff2964e628ba03f65fe21e0b0b94ca0667bdce5def0433d41884758501f284?s=96&d=mm&r=g","caption":"Chuck Wasserstrom"},"description":"Chuck Wasserstrom is the director of communications in the UTC Division of Communications and Marketing.","url":"https:\/\/blogarchive.utc.edu\/campus-weekly\/author\/wyf557\/"}]}},"featured_image_src":"https:\/\/blogarchive.utc.edu\/campus-weekly\/files\/2024\/08\/Chamberlain-Pavilion-22-752-600x400.jpg","featured_image_src_square":"https:\/\/blogarchive.utc.edu\/campus-weekly\/files\/2024\/08\/Chamberlain-Pavilion-22-752-600x600.jpg","author_info":{"display_name":"Chuck Wasserstrom","author_link":"https:\/\/blogarchive.utc.edu\/campus-weekly\/author\/wyf557\/"},"jetpack_featured_media_url":"https:\/\/blogarchive.utc.edu\/campus-weekly\/files\/2024\/08\/Chamberlain-Pavilion-22-752.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/posts\/16570","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/users\/1493"}],"replies":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/comments?post=16570"}],"version-history":[{"count":1,"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/posts\/16570\/revisions"}],"predecessor-version":[{"id":16572,"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/posts\/16570\/revisions\/16572"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/media\/16571"}],"wp:attachment":[{"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/media?parent=16570"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/categories?post=16570"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/campus-weekly\/wp-json\/wp\/v2\/tags?post=16570"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}