{"id":1566,"date":"2009-07-24T13:21:12","date_gmt":"2009-07-24T18:21:12","guid":{"rendered":"https:\/\/blogarchive.utc.edu\/news\/?p=1566"},"modified":"2009-07-24T13:21:12","modified_gmt":"2009-07-24T18:21:12","slug":"grote-hall-to-be-overhauled","status":"publish","type":"post","link":"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/","title":{"rendered":"Grote Hall to be overhauled"},"content":{"rendered":"<p>Major renovations are underway to update Grote Hall as the new lab and classroom spaces for Chemistry, Physics\/Geology\/Astronomy and Environmental Science.\u00a0 This complicated and challenging project demanded a design to satisfy future laboratory requirements and to accommodate the critical lab activity that will remain in operation during construction. The project cost is $8.25 million.\u00a0 It is scheduled for completion by fall 2010.<!--more--><\/p>\n<p>\u201cThe renovations were necessary first and foremost because the building was built in 1968 and it is nearly 40 years old.\u00a0 The building systems had lived their lives and needed upgrading,\u201d said Janet Spraker, Director of Engineering Services.\u00a0 \u201cAdditionally, this laboratory building required numerous code upgrades necessary to ensure proper fume hood operation, safety showers and more.\u201d<\/p>\n<p>What started as a $4.25 million capital maintenance project with mechanical, electrical, and life safety upgrades has become a full building overhaul, Spraker said.\u00a0 Occupants of the building were moved to other locations as well as the new Collins Street modular buildings.<\/p>\n<p>\u201cSince the building had to be mostly vacated to do the work, additional state funds were requested to allow for updating the labs to allow for current teaching methods for Chemistry and Physics\/Geology and providing new Environmental Science labs, in addition to the building infrastructure work,\u201d Spraker said.\u00a0 \u201cAll labs will be outfitted with new casework.\u00a0 The current fume hood count in Grote is around 20, after the project it will be over 70.\u00a0 Most of this is to allow for current methods of teaching organic chemistry and research requirements.\u201d<\/p>\n<p>Plans have been approved by the Tennessee State Fire Marshal and a contract was awarded to Pointe General Contractors.<\/p>\n<p>Facilities Planning and Management will work with the UT System office, the architect, and the general contractor to deliver the project for its scheduled completion date, Spraker said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Major renovations are underway to update Grote Hall as the new lab and classroom spaces for Chemistry, Physics\/Geology\/Astronomy and Environmental Science.\u00a0 This complicated and challenging project demanded a design to satisfy future laboratory requirements and to accommodate the critical lab activity that will remain in operation during construction. The project cost is $8.25 million.\u00a0 It&hellip; <\/p>\n<p class=\"more-link-wrap\"><span><a class=\"more-link button text\" href=\"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/\"><span>Continue Reading <\/span><\/a><\/span><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","_ef_editorial_meta_checkbox_slider":"","_ef_editorial_meta_checkbox_featurette":"","_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[64],"tags":[],"class_list":{"0":"post-1566","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-news","7":"entry"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Grote Hall to be overhauled | UTC News Archive: Jul 2007 - Oct 2025<\/title>\n<meta name=\"description\" content=\"Major renovations are underway to update Grote Hall as the new lab and classroom spaces for Chemistry, Physics\/Geology\/Astronomy and Environmental\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Grote Hall to be overhauled | UTC News Archive: Jul 2007 - Oct 2025\" \/>\n<meta property=\"og:description\" content=\"Major renovations are underway to update Grote Hall as the new lab and classroom spaces for Chemistry, Physics\/Geology\/Astronomy and Environmental\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/\" \/>\n<meta property=\"og:site_name\" content=\"UTC News Archive: Jul 2007 - Oct 2025\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/UTChattanooga\" \/>\n<meta property=\"article:published_time\" content=\"2009-07-24T18:21:12+00:00\" \/>\n<meta name=\"author\" content=\"UTC Communications and Marketing\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@UTChattanooga\" \/>\n<meta name=\"twitter:site\" content=\"@UTChattanooga\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"UTC Communications and Marketing\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2009\\\/07\\\/grote-hall-to-be-overhauled\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2009\\\/07\\\/grote-hall-to-be-overhauled\\\/\"},\"author\":{\"name\":\"UTC Communications and Marketing\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#\\\/schema\\\/person\\\/6a6e78a359d0226ea9e82fb20f53021e\"},\"headline\":\"Grote Hall to be overhauled\",\"datePublished\":\"2009-07-24T18:21:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2009\\\/07\\\/grote-hall-to-be-overhauled\\\/\"},\"wordCount\":299,\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2009\\\/07\\\/grote-hall-to-be-overhauled\\\/\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2009\\\/07\\\/grote-hall-to-be-overhauled\\\/\",\"name\":\"Grote Hall to be overhauled | UTC News Archive: Jul 2007 - Oct 2025\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#website\"},\"datePublished\":\"2009-07-24T18:21:12+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#\\\/schema\\\/person\\\/6a6e78a359d0226ea9e82fb20f53021e\"},\"description\":\"Major renovations are underway to update Grote Hall as the new lab and classroom spaces for Chemistry, Physics\\\/Geology\\\/Astronomy and Environmental\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2009\\\/07\\\/grote-hall-to-be-overhauled\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2009\\\/07\\\/grote-hall-to-be-overhauled\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2009\\\/07\\\/grote-hall-to-be-overhauled\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Grote Hall to be overhauled\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/\",\"name\":\"UTC News Archive: Jul 2007 - Oct 2025\",\"description\":\"Official news releases of the University of Tennessee at Chattanooga\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#\\\/schema\\\/person\\\/6a6e78a359d0226ea9e82fb20f53021e\",\"name\":\"UTC Communications and Marketing\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/705164c90f10c6279b0ac11cd79a3e2bc380ada3197f9c11f122aaf6b03b9c13?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/705164c90f10c6279b0ac11cd79a3e2bc380ada3197f9c11f122aaf6b03b9c13?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/705164c90f10c6279b0ac11cd79a3e2bc380ada3197f9c11f122aaf6b03b9c13?s=96&d=mm&r=g\",\"caption\":\"UTC Communications and Marketing\"},\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Grote Hall to be overhauled | UTC News Archive: Jul 2007 - Oct 2025","description":"Major renovations are underway to update Grote Hall as the new lab and classroom spaces for Chemistry, Physics\/Geology\/Astronomy and Environmental","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Grote Hall to be overhauled | UTC News Archive: Jul 2007 - Oct 2025","og_description":"Major renovations are underway to update Grote Hall as the new lab and classroom spaces for Chemistry, Physics\/Geology\/Astronomy and Environmental","og_url":"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/","og_site_name":"UTC News Archive: Jul 2007 - Oct 2025","article_publisher":"https:\/\/www.facebook.com\/UTChattanooga","article_published_time":"2009-07-24T18:21:12+00:00","author":"UTC Communications and Marketing","twitter_card":"summary_large_image","twitter_creator":"@UTChattanooga","twitter_site":"@UTChattanooga","twitter_misc":{"Written by":"UTC Communications and Marketing","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/#article","isPartOf":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/"},"author":{"name":"UTC Communications and Marketing","@id":"https:\/\/blogarchive.utc.edu\/news\/#\/schema\/person\/6a6e78a359d0226ea9e82fb20f53021e"},"headline":"Grote Hall to be overhauled","datePublished":"2009-07-24T18:21:12+00:00","mainEntityOfPage":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/"},"wordCount":299,"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/","url":"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/","name":"Grote Hall to be overhauled | UTC News Archive: Jul 2007 - Oct 2025","isPartOf":{"@id":"https:\/\/blogarchive.utc.edu\/news\/#website"},"datePublished":"2009-07-24T18:21:12+00:00","author":{"@id":"https:\/\/blogarchive.utc.edu\/news\/#\/schema\/person\/6a6e78a359d0226ea9e82fb20f53021e"},"description":"Major renovations are underway to update Grote Hall as the new lab and classroom spaces for Chemistry, Physics\/Geology\/Astronomy and Environmental","breadcrumb":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/blogarchive.utc.edu\/news\/2009\/07\/grote-hall-to-be-overhauled\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogarchive.utc.edu\/news\/"},{"@type":"ListItem","position":2,"name":"Grote Hall to be overhauled"}]},{"@type":"WebSite","@id":"https:\/\/blogarchive.utc.edu\/news\/#website","url":"https:\/\/blogarchive.utc.edu\/news\/","name":"UTC News Archive: Jul 2007 - Oct 2025","description":"Official news releases of the University of Tennessee at Chattanooga","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogarchive.utc.edu\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogarchive.utc.edu\/news\/#\/schema\/person\/6a6e78a359d0226ea9e82fb20f53021e","name":"UTC Communications and Marketing","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/705164c90f10c6279b0ac11cd79a3e2bc380ada3197f9c11f122aaf6b03b9c13?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/705164c90f10c6279b0ac11cd79a3e2bc380ada3197f9c11f122aaf6b03b9c13?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/705164c90f10c6279b0ac11cd79a3e2bc380ada3197f9c11f122aaf6b03b9c13?s=96&d=mm&r=g","caption":"UTC Communications and Marketing"},"url":"https:\/\/blogarchive.utc.edu\/news\/author\/admin\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"UTC Communications and Marketing","author_link":"https:\/\/blogarchive.utc.edu\/news\/author\/admin\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts\/1566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/comments?post=1566"}],"version-history":[{"count":1,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts\/1566\/revisions"}],"predecessor-version":[{"id":1567,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts\/1566\/revisions\/1567"}],"wp:attachment":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/media?parent=1566"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/categories?post=1566"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/tags?post=1566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}