{"id":16879,"date":"2017-05-02T16:47:41","date_gmt":"2017-05-02T20:47:41","guid":{"rendered":"https:\/\/blogarchive.utc.edu\/news\/?p=16879"},"modified":"2017-07-06T14:32:44","modified_gmt":"2017-07-06T18:32:44","slug":"building-future-west-campus-housing-taking-shape","status":"publish","type":"post","link":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/","title":{"rendered":"Building the Future: West Campus Housing taking shape"},"content":{"rendered":"<p><iframe title=\"University of Tennessee Chattanooga West Campus Construction Tour\" style=\"max-width: 100%;\"style=\"max-width: 100%;\"src=\"https:\/\/www.youtube.com\/embed\/CuPRwoG5rpg?rel=0&#038;modestbranding=1&#038;autohide=1&#038;showinfo=0&#038;controls=0\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen><\/iframe><\/p>\n<p>Sounds fill the air.<\/p>\n<p>Thudding hammers. Whining drills. Screaming, grinding saws. Wood, metal and other trash crash-banging into a dumpster.<\/p>\n<p>Above it all, a 120-foot crane slowly and silently spins, lifting equipment and supplies off the ground, delivering them six to nine floors up.<\/p>\n<p>Construction is nonstop at the site of the new West Campus Housing, located at the corner of Vine and Houston Streets. Due to open in Fall 2018, the structural elements of the $70 million facility \u2014 walls, floors and ceilings \u2014 are 90 percent done, says Jeremy Busby, job superintendent for Hoar Construction Co., the building contractor.<\/p>\n<p>West Campus is a massive job, he says, with about 200 workers \u2014 all in fluorescent yellow vests and hardhats \u2014 swarming over it on any given day. When finished, it will flesh out about 231,000 square feet.<\/p>\n<p>\u201cThis is a hoss,\u201d he says. \u201cIt\u2019s a simple building construction-wise, but this is a big building.\u201d<\/p>\n<div id=\"attachment_16881\" class=\"wp-caption alignright\" ><img decoding=\"async\" class=\"wp-image-16881 size-medium\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2017\/04\/IMG_0876.jpg\" alt=\"\" style=\"max-width: 100%;\"style=\"max-width: 100%;\"\/><p class=\"wp-caption-text\">West Campus Housing will have 600 beds when finished.<\/p><\/div>\n<p>On Saturday, the last bit of concrete was poured on the East Wing\u2019s ninth floor, the so-called \u201ctopping out\u201d of the building. Barring any monsoon-like rains that last for a week, they should be able to hit the opening-day mark, Busby says.<\/p>\n<p>The design of the residential floors is \u201ccookie cutter,\u201d he says, each an exact copy of the others, making it easier to build since they&#8217;re all on the same template.<\/p>\n<p>When finished, West Campus will have 600 beds, four in each two-bedroom suite. Each suite has a private bathroom and shower and a common area where students can relax and watch TV if they have one.<\/p>\n<p>The floors also have larger, centrally located common areas as well as triangular ones on the four corners of each. Glass-enclosed and lit from the inside, they&#8217;ve been nicknamed \u201cLanterns.\u201d<\/p>\n<p>The feeling of a community on each floor as well as inside the building as a whole is intentional, says Dee Dee Anderson, interim vice chancellor for student development. While UTC has many living spaces on campus, they&#8217;re apartment-style, which tends to isolate students instead of bringing them together. West Campus fills a need for \u201ctraditional-style housing\u201d on campus, she says.<\/p>\n<p>That&#8217;s even more important since the building will be housing mostly freshmen, she says.<\/p>\n<p>\u201cWe want to create an environment that gets them engaged on campus, where they can meet their classmates and begin that process of becoming part of the community and becoming a Moc,\u201d Anderson says.<\/p>\n<p>During a tour last week of several floors, Busby points out various details of construction. Metal-stud walls, plumbing and heating\/air conditioning ducts are in place on several of the lower floors, while upper floors are mostly wide open, metal wall studs laying in piles on the concrete floors.<\/p>\n<p>The facility has two residential wings. West Wing has six stories, with floors two through five slated for students. East Wing is nine stories, with floors two through seven as living space. The top floors in each wing are reserved for machinery.<\/p>\n<p>The lobby inside the building\u2019s front entrance will have a small Barnes and Noble bookstore and an Einstein Bagels with other storefronts being discussed and pursued.<\/p>\n<p>Underneath the building are two underground parking lots with a total of 446 spaces. Located next to McKenzie Arena, six tennis courts and a tennis center with locker rooms also will be part of the West Campus complex but open to all students.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction is nonstop at the site of the new West Campus Housing, due to open in Fall 2018.<\/p>\n<p class=\"more-link-wrap\"><span><a class=\"more-link button text\" href=\"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/\"><span>Continue Reading <\/a><\/span><\/p>\n","protected":false},"author":1105,"featured_media":16882,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","_ef_editorial_meta_checkbox_slider":"","_ef_editorial_meta_checkbox_featurette":"","_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[8245,15],"tags":[536,916,188,12879],"class_list":{"0":"post-16879","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-campus","8":"category-construction-2","9":"tag-construction","10":"tag-dee-dee-anderson","11":"tag-housing","12":"tag-west-campus","13":"entry"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Building the Future: West Campus Housing taking shape | UTC News Archive: Jul 2007 - Oct 2025<\/title>\n<meta name=\"description\" content=\"Construction is nonstop at the site of the new West Campus Housing, due to open in Fall 2018.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Building the Future: West Campus Housing taking shape | UTC News Archive: Jul 2007 - Oct 2025\" \/>\n<meta property=\"og:description\" content=\"Construction is nonstop at the site of the new West Campus Housing, due to open in Fall 2018.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/\" \/>\n<meta property=\"og:site_name\" content=\"UTC News Archive: Jul 2007 - Oct 2025\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/UTChattanooga\" \/>\n<meta property=\"article:published_time\" content=\"2017-05-02T20:47:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-07-06T18:32:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blogarchive.utc.edu\/news\/files\/2017\/04\/IMG_0876.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1632\" \/>\n\t<meta property=\"og:image:height\" content=\"1224\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Shawn Ryan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@UTChattanooga\" \/>\n<meta name=\"twitter:site\" content=\"@UTChattanooga\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Shawn Ryan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/\"},\"author\":{\"name\":\"Shawn Ryan\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#\\\/schema\\\/person\\\/7c7532013925b3412f8142e378b04942\"},\"headline\":\"Building the Future: West Campus Housing taking shape\",\"datePublished\":\"2017-05-02T20:47:41+00:00\",\"dateModified\":\"2017-07-06T18:32:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/\"},\"wordCount\":592,\"commentCount\":1,\"image\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/files\\\/2017\\\/04\\\/IMG_0876.jpg\",\"keywords\":[\"construction\",\"Dee Dee Anderson\",\"Housing\",\"West Campus\"],\"articleSection\":[\"Campus\",\"Construction\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/\",\"name\":\"Building the Future: West Campus Housing taking shape | UTC News Archive: Jul 2007 - Oct 2025\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/files\\\/2017\\\/04\\\/IMG_0876.jpg\",\"datePublished\":\"2017-05-02T20:47:41+00:00\",\"dateModified\":\"2017-07-06T18:32:44+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#\\\/schema\\\/person\\\/7c7532013925b3412f8142e378b04942\"},\"description\":\"Construction is nonstop at the site of the new West Campus Housing, due to open in Fall 2018.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/files\\\/2017\\\/04\\\/IMG_0876.jpg\",\"contentUrl\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/files\\\/2017\\\/04\\\/IMG_0876.jpg\",\"width\":1280,\"height\":960},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2017\\\/05\\\/building-future-west-campus-housing-taking-shape\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Building the Future: West Campus Housing taking shape\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/\",\"name\":\"UTC News Archive: Jul 2007 - Oct 2025\",\"description\":\"Official news releases of the University of Tennessee at Chattanooga\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#\\\/schema\\\/person\\\/7c7532013925b3412f8142e378b04942\",\"name\":\"Shawn Ryan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g\",\"caption\":\"Shawn Ryan\"},\"description\":\"Shawn Ryan is the executive staff writer in the Office of Communications and Marketing at UTC.\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/author\\\/hqv743\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Building the Future: West Campus Housing taking shape | UTC News Archive: Jul 2007 - Oct 2025","description":"Construction is nonstop at the site of the new West Campus Housing, due to open in Fall 2018.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Building the Future: West Campus Housing taking shape | UTC News Archive: Jul 2007 - Oct 2025","og_description":"Construction is nonstop at the site of the new West Campus Housing, due to open in Fall 2018.","og_url":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/","og_site_name":"UTC News Archive: Jul 2007 - Oct 2025","article_publisher":"https:\/\/www.facebook.com\/UTChattanooga","article_published_time":"2017-05-02T20:47:41+00:00","article_modified_time":"2017-07-06T18:32:44+00:00","og_image":[{"width":1632,"height":1224,"url":"https:\/\/blogarchive.utc.edu\/news\/files\/2017\/04\/IMG_0876.jpg","type":"image\/jpeg"}],"author":"Shawn Ryan","twitter_card":"summary_large_image","twitter_creator":"@UTChattanooga","twitter_site":"@UTChattanooga","twitter_misc":{"Written by":"Shawn Ryan","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/#article","isPartOf":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/"},"author":{"name":"Shawn Ryan","@id":"https:\/\/blogarchive.utc.edu\/news\/#\/schema\/person\/7c7532013925b3412f8142e378b04942"},"headline":"Building the Future: West Campus Housing taking shape","datePublished":"2017-05-02T20:47:41+00:00","dateModified":"2017-07-06T18:32:44+00:00","mainEntityOfPage":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/"},"wordCount":592,"commentCount":1,"image":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/#primaryimage"},"thumbnailUrl":"https:\/\/blogarchive.utc.edu\/news\/files\/2017\/04\/IMG_0876.jpg","keywords":["construction","Dee Dee Anderson","Housing","West Campus"],"articleSection":["Campus","Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/","url":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/","name":"Building the Future: West Campus Housing taking shape | UTC News Archive: Jul 2007 - Oct 2025","isPartOf":{"@id":"https:\/\/blogarchive.utc.edu\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/#primaryimage"},"image":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/#primaryimage"},"thumbnailUrl":"https:\/\/blogarchive.utc.edu\/news\/files\/2017\/04\/IMG_0876.jpg","datePublished":"2017-05-02T20:47:41+00:00","dateModified":"2017-07-06T18:32:44+00:00","author":{"@id":"https:\/\/blogarchive.utc.edu\/news\/#\/schema\/person\/7c7532013925b3412f8142e378b04942"},"description":"Construction is nonstop at the site of the new West Campus Housing, due to open in Fall 2018.","breadcrumb":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/#primaryimage","url":"https:\/\/blogarchive.utc.edu\/news\/files\/2017\/04\/IMG_0876.jpg","contentUrl":"https:\/\/blogarchive.utc.edu\/news\/files\/2017\/04\/IMG_0876.jpg","width":1280,"height":960},{"@type":"BreadcrumbList","@id":"https:\/\/blogarchive.utc.edu\/news\/2017\/05\/building-future-west-campus-housing-taking-shape\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogarchive.utc.edu\/news\/"},{"@type":"ListItem","position":2,"name":"Building the Future: West Campus Housing taking shape"}]},{"@type":"WebSite","@id":"https:\/\/blogarchive.utc.edu\/news\/#website","url":"https:\/\/blogarchive.utc.edu\/news\/","name":"UTC News Archive: Jul 2007 - Oct 2025","description":"Official news releases of the University of Tennessee at Chattanooga","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogarchive.utc.edu\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogarchive.utc.edu\/news\/#\/schema\/person\/7c7532013925b3412f8142e378b04942","name":"Shawn Ryan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g","caption":"Shawn Ryan"},"description":"Shawn Ryan is the executive staff writer in the Office of Communications and Marketing at UTC.","url":"https:\/\/blogarchive.utc.edu\/news\/author\/hqv743\/"}]}},"featured_image_src":"https:\/\/blogarchive.utc.edu\/news\/files\/2017\/04\/IMG_0876.jpg","featured_image_src_square":"https:\/\/blogarchive.utc.edu\/news\/files\/2017\/04\/IMG_0876.jpg","author_info":{"display_name":"Shawn Ryan","author_link":"https:\/\/blogarchive.utc.edu\/news\/author\/hqv743\/"},"jetpack_featured_media_url":"https:\/\/blogarchive.utc.edu\/news\/files\/2017\/04\/IMG_0876.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts\/16879","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/users\/1105"}],"replies":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/comments?post=16879"}],"version-history":[{"count":12,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts\/16879\/revisions"}],"predecessor-version":[{"id":17413,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts\/16879\/revisions\/17413"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/media\/16882"}],"wp:attachment":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/media?parent=16879"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/categories?post=16879"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/tags?post=16879"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}