{"id":32617,"date":"2020-09-08T09:35:19","date_gmt":"2020-09-08T13:35:19","guid":{"rendered":"https:\/\/blogarchive.utc.edu\/news\/?p=32617"},"modified":"2020-09-30T09:39:47","modified_gmt":"2020-09-30T13:39:47","slug":"improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc","status":"publish","type":"post","link":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/","title":{"rendered":"Improvements changing both the outward faces and interior spaces at UTC"},"content":{"rendered":"<div id=\"attachment_32627\" class=\"wp-caption aligncenter\" ><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"489\" data-attachment-id=\"32627\" data-permalink=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/construction-19\/\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction3.jpg\" data-orig-size=\"750,489\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;20&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Construction, Wednesday, May 22, 2019.&quot;,&quot;created_timestamp&quot;:&quot;1558449917&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;24&quot;,&quot;iso&quot;:&quot;500&quot;,&quot;shutter_speed&quot;:&quot;0.008&quot;,&quot;title&quot;:&quot;Construction-19&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Construction-19\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;Construction, Wednesday, May 22, 2019.&lt;\/p&gt;\n\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction3.jpg\" class=\"wp-image-32627\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction3.jpg\" alt=\"\" style=\"max-width: 100%;\"style=\"max-width: 100%;\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction3.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction3-300x196.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction3-580x378.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction3-610x398.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction3-250x163.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction3-600x391.jpg 600w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><p class=\"wp-caption-text\">The remodeling of Lupton Library into Lupton Hall is the largest construction project on campus in the past year.<\/p><\/div>\n<p>As fall semester 2020 begins, several construction projects on campus are either finished, close to finishing or underway. Here is a rundown of them:<\/p>\n<h4><strong>Lupton Hall<\/strong><\/h4>\n<p>The largest job on campus has been the gutting and total renovation of Lupton Library into Lupton Hall, taking the 116,000 square foot former library and replacing all the building systems, including electrical, heating and air conditioning and lighting. Part of the building\u2019s renovation also is rearranging its layout for general classrooms, offices and other spaces.<\/p>\n<p>The first floor will house the Center for Women and Gender Equity and the Multicultural Center, improves a new healthy dining option and creates offices serving international students. Work is finishing up on this floor but still underway.<\/p>\n<p>The second and third floors will be the new home for some departments in the College of Arts and Sciences. The third floor will house the Office of Dean Pam Riggs-Gelasco and the Math English Departments. The second floor with be home to the departments of Communications, Philosophy and Religion, Modern and Classical Language and Literature. It also will be the location of the College of Arts and Sciences Advising Hub. \u00a0Move-in is almost complete for the two floors.<\/p>\n<p>Cardiac Hill next to Lupton Hall is scheduled to reopen by the start of classes on the Aug. 17,\u00a0so there should be no disruptions to pedestrian traffic.<\/p>\n<h4><\/h4>\n<h4><strong>Fletcher Hall<\/strong><\/h4>\n<p>Home to the Gary W. Rollins College of Business, the building\u2019s first phase of renovations included new interior finishes and furnishings and improvements to lighting, restrooms and facilities for students with disabilities.<\/p>\n<p>Elevators and stairwells have been renovated. The second, third and fourth floors have been reconfigured for better efficiency and functionality.<\/p>\n<p>Faculty have been moving in, and the building will be open for the start of classes on Aug. 17. Contractors are completing a few areas, but the work will not interfere with daily operations.<\/p>\n<h4><\/h4>\n<h4><strong>Fine Arts Center<\/strong><\/h4>\n<p>Renovation of the Fine Arts Center is essentially completed, and it will be open for the fall semester. A few tasks are wrapping up, but improvements are finished on the Roland B. Hayes Concert Hall, Dorothy Hackett Ward Theater, George Ayers Cress Gallery of Art, general classrooms, offices and band space. Faculty and staff are moving back in while contractors finish details inside the concert halls and other secluded spaces.<\/p>\n<h4><\/h4>\n<h4><strong>Center for Innovation and Entrepreneurship<\/strong><\/h4>\n<p>Located on the second floor of the James R. Mapp Building, the new Center for Innovation and Entrepreneurship is designed for students across campus to use. Ready for fall semester, the center has a large central area known as &#8220;The Nest,&#8221; which is primarily designed for students to work and collaborate on their business ideas. The center also has a collaborative workshop area \u2014 known as a \u201cmakerspace\u201d \u2014 that supplies equipment and technology for creative projects.<\/p>\n<h4><\/h4>\n<h4><strong>West Campus Pedestrian Way<\/strong><\/h4>\n<p>Improvements provide a connection from the West Campus Housing parking garage to previously existing Vine Street and Boling Apartment sidewalks. The changes will make it easier for students in Boling to walk to dining and bookstore services inside West Campus. A new common area includes a hammock lounge, permanent chairs and tables for eating outside as well as new trees and flower beds.<\/p>\n<h4><\/h4>\n<h4><strong>Aquatic and Recreation Center<\/strong><\/h4>\n<p>The center\u2019s pool and water slide have been repainted, along with a Power C painted on the bottom of the pool. New colors also have been added to the walls and benches in the area.<\/p>\n<p>In the Outdoors section, stand-up paddleboards, kayaks, sleeping bags, tents and other items are now available. New bouldering wall mats are in place and a mural has been painted by a UTC student on one of the walls. Student-built furniture has been added and cabinets have been freshened with new covers. Trackers also are being placed on all the fitness equipment to record usage patterns.<\/p>\n<h4><\/h4>\n<h4><strong>Roof Replacements<\/strong><\/h4>\n<p>Routine roof work took place at the following buildings: Multi-Disciplinary, Metro and Military Science. Replacement work is currently underway at the College of Engineering and Computer Science.<\/p>\n<h4><\/h4>\n<h4><strong>McKenzie Arena<\/strong><\/h4>\n<p>The sound system has been upgraded, replacing the analog equipment with state-of-the-art digital audio. The old system was designed for public announcements. The new system has a range of new audio equipment and can target specific \u201czones\u201d of the arena with both public announcements and music.<\/p>\n<h4><\/h4>\n<h4><strong>Central Energy Plant<\/strong><\/h4>\n<p>Work is underway on the Central Energy Plant underground lines at two locations: Lot 21 near Frist Hall and Lot 36 in between Davenport Hall and the Lawson Center. Both will take a few parking spaces and are part of continuing efforts to connect underground lines throughout campus.<\/p>\n<h4><\/h4>\n<h4><strong>540 McCallie Building<\/strong><\/h4>\n<p>Retrofitting the fifth\u00a0floor is on track to begin shortly. It will include new interior finishes and furnishings as well as upgrades to audiovisual equipment and overall technology. Improvements also will involve lighting, restrooms and facilities for students with disabilities.<\/p>\n<h4><strong>\u00a0<\/strong><\/h4>\n<h4><strong>New projects<\/strong><\/h4>\n<p>Two upcoming projects are renovations to Hunter Hall and the construction of the Wofford Family Athletics Center, a 70,000-square-foot addition\u00a0to McKenzie Arena. Both are in the planning stages with final designs now in the hands of architects.<\/p>\n<div class=\"tiled-gallery type-rectangular tiled-gallery-unresized\" data-original-width=\"880\" data-carousel-extra='{&quot;blog_id&quot;:9,&quot;permalink&quot;:&quot;https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/&quot;,&quot;likes_blog_id&quot;:202990556}' itemscope itemtype=\"http:\/\/schema.org\/ImageGallery\" > <div class=\"gallery-row\" style=\"width: 880px; height: 376px;\" data-original-width=\"880\" data-original-height=\"376\" > <div class=\"gallery-group images-1\" style=\"width: 596px; height: 376px;\" data-original-width=\"596\" data-original-height=\"376\" > <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/construction11\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"592\"> <meta itemprop=\"height\" content=\"372\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32635\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11.jpg\" data-orig-size=\"900,565\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;3.2&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1574082210&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;27&quot;,&quot;iso&quot;:&quot;100&quot;,&quot;shutter_speed&quot;:&quot;0.002&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"construction11\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11-300x188.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11.jpg 900w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11-300x188.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11-768x482.jpg 768w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11-580x364.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11-610x383.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11-250x157.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction11-600x377.jpg 600w\" width=\"592\" height=\"372\" loading=\"lazy\" data-original-width=\"592\" data-original-height=\"372\" itemprop=\"http:\/\/schema.org\/image\" title=\"construction11\" alt=\"Construction on Lupton Library.\" style=\"width: 592px; height: 372px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> Construction on Lupton Library. <\/div> <\/div> <\/div> <!-- close group --> <div class=\"gallery-group images-2\" style=\"width: 284px; height: 376px;\" data-original-width=\"284\" data-original-height=\"376\" > <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/lupton-renovations-20\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"280\"> <meta itemprop=\"height\" content=\"197\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32637\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction13.jpg\" data-orig-size=\"750,528\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;4.5&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Wednesday, Aug 5, 2020 in the Lupton building.&quot;,&quot;created_timestamp&quot;:&quot;1596635171&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;27&quot;,&quot;iso&quot;:&quot;2000&quot;,&quot;shutter_speed&quot;:&quot;0.00625&quot;,&quot;title&quot;:&quot;Lupton Renovations-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Lupton Renovations-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction13-300x211.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction13.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction13.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction13.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction13-300x211.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction13-580x408.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction13-610x429.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction13-250x176.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction13-568x400.jpg 568w\" width=\"280\" height=\"197\" loading=\"lazy\" data-original-width=\"280\" data-original-height=\"197\" itemprop=\"http:\/\/schema.org\/image\" title=\"Lupton Renovations-20\" alt=\"The interior of Lupton Library was gutted and revamped.\" style=\"width: 280px; height: 197px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> The interior of Lupton Library was gutted and revamped. <\/div> <\/div> <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/lupton-20-3\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"280\"> <meta itemprop=\"height\" content=\"171\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32644\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction20.jpg\" data-orig-size=\"750,459\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;7.1&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Finishing touches are being made Monday, Aug 17, 2020 in Lupton Hall.&quot;,&quot;created_timestamp&quot;:&quot;1597135473&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;24&quot;,&quot;iso&quot;:&quot;2000&quot;,&quot;shutter_speed&quot;:&quot;0.00625&quot;,&quot;title&quot;:&quot;Lupton-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Lupton-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction20-300x184.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction20.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction20.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction20.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction20-300x184.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction20-580x355.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction20-610x373.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction20-250x153.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction20-600x367.jpg 600w\" width=\"280\" height=\"171\" loading=\"lazy\" data-original-width=\"280\" data-original-height=\"171\" itemprop=\"http:\/\/schema.org\/image\" title=\"Lupton-20\" alt=\"A Freshens Fresh Food has been added to the new Lupton Hall.\" style=\"width: 280px; height: 171px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> A Freshens Fresh Food has been added to the new Lupton Hall. <\/div> <\/div> <\/div> <!-- close group --> <\/div> <!-- close row --> <div class=\"gallery-row\" style=\"width: 880px; height: 663px;\" data-original-width=\"880\" data-original-height=\"663\" > <div class=\"gallery-group images-3\" style=\"width: 332px; height: 663px;\" data-original-width=\"332\" data-original-height=\"663\" > <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/lupton-20-2\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"328\"> <meta itemprop=\"height\" content=\"218\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32639\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction15.jpg\" data-orig-size=\"750,499\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;7.1&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Finishing touches are being made Monday, Aug 17, 2020 in Lupton Hall.&quot;,&quot;created_timestamp&quot;:&quot;1597135227&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;24&quot;,&quot;iso&quot;:&quot;2000&quot;,&quot;shutter_speed&quot;:&quot;0.008&quot;,&quot;title&quot;:&quot;Lupton-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Lupton-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction15-300x200.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction15.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction15.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction15.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction15-300x200.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction15-580x386.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction15-610x406.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction15-250x166.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction15-600x400.jpg 600w\" width=\"328\" height=\"218\" loading=\"lazy\" data-original-width=\"328\" data-original-height=\"218\" itemprop=\"http:\/\/schema.org\/image\" title=\"Lupton-20\" alt=\"A common area in the new Lupton Hall.\" style=\"width: 328px; height: 218px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> A common area in the new Lupton Hall. <\/div> <\/div> <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/renovated-spaces-20\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"328\"> <meta itemprop=\"height\" content=\"215\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32631\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction7.jpg\" data-orig-size=\"750,492\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;2.8&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Faculty and staff move back into the Fine Arts Center Monday, July 27, 2020.&quot;,&quot;created_timestamp&quot;:&quot;1595844623&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;24&quot;,&quot;iso&quot;:&quot;1600&quot;,&quot;shutter_speed&quot;:&quot;0.004&quot;,&quot;title&quot;:&quot;Renovated Spaces-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Renovated Spaces-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction7-300x197.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction7.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction7.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction7.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction7-300x197.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction7-580x380.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction7-610x400.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction7-250x164.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction7-600x394.jpg 600w\" width=\"328\" height=\"215\" loading=\"lazy\" data-original-width=\"328\" data-original-height=\"215\" itemprop=\"http:\/\/schema.org\/image\" title=\"Renovated Spaces-20\" alt=\"Remodeling underway in the Roland B. Hayes Concert Hall in the Fine Arts Building, which has been totally renovated.\" style=\"width: 328px; height: 215px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> Remodeling underway in the Roland B. Hayes Concert Hall in the Fine Arts Building, which has been totally renovated. <\/div> <\/div> <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/fine-arts-center-20\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"328\"> <meta itemprop=\"height\" content=\"218\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32643\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction19.jpg\" data-orig-size=\"750,499\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;5.6&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Fine Arts Center, Wednesday, Aug 12, 2020&quot;,&quot;created_timestamp&quot;:&quot;1597248782&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;14&quot;,&quot;iso&quot;:&quot;800&quot;,&quot;shutter_speed&quot;:&quot;0.025&quot;,&quot;title&quot;:&quot;Fine Arts Center-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Fine Arts Center-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction19-300x200.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction19.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction19.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction19.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction19-300x200.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction19-580x386.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction19-610x406.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction19-250x166.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction19-600x400.jpg 600w\" width=\"328\" height=\"218\" loading=\"lazy\" data-original-width=\"328\" data-original-height=\"218\" itemprop=\"http:\/\/schema.org\/image\" title=\"Fine Arts Center-20\" alt=\"The Roland B. Hayes Concert Hall after remodeling.\" style=\"width: 328px; height: 218px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> The Roland B. Hayes Concert Hall after remodeling. <\/div> <\/div> <\/div> <!-- close group --> <div class=\"gallery-group images-1\" style=\"width: 548px; height: 663px;\" data-original-width=\"548\" data-original-height=\"663\" > <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/renovated-spaces-20-4\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"544\"> <meta itemprop=\"height\" content=\"659\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32634\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction10.jpg\" data-orig-size=\"620,750\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;2.8&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Faculty and staff move back into Fletcher Hall Monday, July 27, 2020.&quot;,&quot;created_timestamp&quot;:&quot;1595842685&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;44&quot;,&quot;iso&quot;:&quot;1600&quot;,&quot;shutter_speed&quot;:&quot;0.004&quot;,&quot;title&quot;:&quot;Renovated Spaces-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Renovated Spaces-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction10-248x300.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction10.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction10.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction10.jpg 620w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction10-248x300.jpg 248w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction10-580x702.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction10-610x738.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction10-165x200.jpg 165w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction10-331x400.jpg 331w\" width=\"544\" height=\"659\" loading=\"lazy\" data-original-width=\"544\" data-original-height=\"659\" itemprop=\"http:\/\/schema.org\/image\" title=\"Renovated Spaces-20\" alt=\"Faculty and staff move back into Fletcher Hall Monday, July 27, 2020.\" style=\"width: 544px; height: 659px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> Faculty and staff move back into Fletcher Hall Monday, July 27, 2020. <\/div> <\/div> <\/div> <!-- close group --> <\/div> <!-- close row --> <div class=\"gallery-row\" style=\"width: 880px; height: 389px;\" data-original-width=\"880\" data-original-height=\"389\" > <div class=\"gallery-group images-1\" style=\"width: 574px; height: 389px;\" data-original-width=\"574\" data-original-height=\"389\" > <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/renovated-spaces-20-3\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"570\"> <meta itemprop=\"height\" content=\"385\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32633\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9.jpg\" data-orig-size=\"750,506\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;2.8&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Faculty and staff move back into Fletcher Hall Monday, July 27, 2020.&quot;,&quot;created_timestamp&quot;:&quot;1595841766&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;24&quot;,&quot;iso&quot;:&quot;1600&quot;,&quot;shutter_speed&quot;:&quot;0.0025&quot;,&quot;title&quot;:&quot;Renovated Spaces-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Renovated Spaces-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9-300x202.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9-300x202.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9-580x391.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9-610x412.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9-250x169.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9-593x400.jpg 593w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction9-562x380.jpg 562w\" width=\"570\" height=\"385\" loading=\"lazy\" data-original-width=\"570\" data-original-height=\"385\" itemprop=\"http:\/\/schema.org\/image\" title=\"Renovated Spaces-20\" alt=\"In late July, faculty and staff moved back into Fletcher Hall, home to the Gary W. Collins College of Business.\" style=\"width: 570px; height: 385px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> In late July, faculty and staff moved back into Fletcher Hall, home to the Gary W. Collins College of Business. <\/div> <\/div> <\/div> <!-- close group --> <div class=\"gallery-group images-1\" style=\"width: 306px; height: 389px;\" data-original-width=\"306\" data-original-height=\"389\" > <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/renovated-spaces-20-2\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"302\"> <meta itemprop=\"height\" content=\"385\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32632\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction8.jpg\" data-orig-size=\"588,750\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;2.8&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Faculty and staff move back into Fletcher Hall Monday, July 27, 2020.&quot;,&quot;created_timestamp&quot;:&quot;1595841594&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;70&quot;,&quot;iso&quot;:&quot;125&quot;,&quot;shutter_speed&quot;:&quot;0.0003125&quot;,&quot;title&quot;:&quot;Renovated Spaces-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Renovated Spaces-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction8-235x300.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction8.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction8.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction8.jpg 588w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction8-235x300.jpg 235w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction8-580x740.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction8-157x200.jpg 157w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction8-314x400.jpg 314w\" width=\"302\" height=\"385\" loading=\"lazy\" data-original-width=\"302\" data-original-height=\"385\" itemprop=\"http:\/\/schema.org\/image\" title=\"Renovated Spaces-20\" alt=\"Faculty and staff move back into Fletcher Hall Monday, July 27, 2020.\" style=\"width: 302px; height: 385px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> Faculty and staff move back into Fletcher Hall Monday, July 27, 2020. <\/div> <\/div> <\/div> <!-- close group --> <\/div> <!-- close row --> <div class=\"gallery-row\" style=\"width: 880px; height: 408px;\" data-original-width=\"880\" data-original-height=\"408\" > <div class=\"gallery-group images-2\" style=\"width: 298px; height: 408px;\" data-original-width=\"298\" data-original-height=\"408\" > <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/center-for-innovation-and-entrepreneurship-20-2\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"294\"> <meta itemprop=\"height\" content=\"195\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32630\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction6.jpg\" data-orig-size=\"750,499\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;2.8&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Libby Santin in the Center for Innovation and Entrepreneurship, Thursday, July 30, 2020. Libby Santin in the Center for Innovation and Entrepreneurship in the Mapp Building, Thursday, July 30, 2020.&quot;,&quot;created_timestamp&quot;:&quot;1596131742&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;24&quot;,&quot;iso&quot;:&quot;1250&quot;,&quot;shutter_speed&quot;:&quot;0.004&quot;,&quot;title&quot;:&quot;Center for Innovation and Entrepreneurship-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Center for Innovation and Entrepreneurship-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction6-300x200.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction6.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction6.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction6.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction6-300x200.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction6-580x386.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction6-610x406.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction6-250x166.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction6-600x400.jpg 600w\" width=\"294\" height=\"195\" loading=\"lazy\" data-original-width=\"294\" data-original-height=\"195\" itemprop=\"http:\/\/schema.org\/image\" title=\"Center for Innovation and Entrepreneurship-20\" alt=\"Libby Santin in the Center for Innovation and Entrepreneurship, Thursday, July 30, 2020. Libby Santin in the Center for Innovation and Entrepreneurship in the Mapp Building, Thursday, July 30, 2020.\" style=\"width: 294px; height: 195px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> Libby Santin in the Center for Innovation and Entrepreneurship, Thursday, July 30, 2020. Libby Santin in the Center for Innovation and Entrepreneurship in the Mapp Building, Thursday, July 30, 2020. <\/div> <\/div> <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/center-for-innovation-and-entrepreneurship-20\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"294\"> <meta itemprop=\"height\" content=\"205\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32629\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction5.jpg\" data-orig-size=\"750,522\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;2.8&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Libby Santin in the Center for Innovation and Entrepreneurship, Thursday, July 30, 2020. Libby Santin in the Center for Innovation and Entrepreneurship in the Mapp Building, Thursday, July 30, 2020.&quot;,&quot;created_timestamp&quot;:&quot;1596131652&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;24&quot;,&quot;iso&quot;:&quot;1250&quot;,&quot;shutter_speed&quot;:&quot;0.004&quot;,&quot;title&quot;:&quot;Center for Innovation and Entrepreneurship-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Center for Innovation and Entrepreneurship-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction5-300x209.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction5.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction5.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction5.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction5-300x209.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction5-580x404.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction5-610x425.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction5-250x174.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction5-575x400.jpg 575w\" width=\"294\" height=\"205\" loading=\"lazy\" data-original-width=\"294\" data-original-height=\"205\" itemprop=\"http:\/\/schema.org\/image\" title=\"Center for Innovation and Entrepreneurship-20\" alt=\"The Center for Innovation and Entrepreneurship is a new addition to the James R. Mapp Building.\" style=\"width: 294px; height: 205px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> The Center for Innovation and Entrepreneurship is a new addition to the James R. Mapp Building. <\/div> <\/div> <\/div> <!-- close group --> <div class=\"gallery-group images-1\" style=\"width: 582px; height: 408px;\" data-original-width=\"582\" data-original-height=\"408\" > <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/slide-painting-20\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"578\"> <meta itemprop=\"height\" content=\"404\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32640\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg\" data-orig-size=\"750,525\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;3.5&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;People paint the slide at the ARC Wednesday, April 30, 2020.&quot;,&quot;created_timestamp&quot;:&quot;1588149190&quot;,&quot;copyright&quot;:&quot;University of Tennesee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;70&quot;,&quot;iso&quot;:&quot;1600&quot;,&quot;shutter_speed&quot;:&quot;0.00625&quot;,&quot;title&quot;:&quot;Slide Painting-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Slide Painting-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16-300x210.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16-300x210.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16-580x406.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16-610x427.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16-250x175.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16-571x400.jpg 571w\" width=\"578\" height=\"404\" loading=\"lazy\" data-original-width=\"578\" data-original-height=\"404\" itemprop=\"http:\/\/schema.org\/image\" title=\"Slide Painting-20\" alt=\"The water slide in the Aquatic and Recreation Center has been repainted.\" style=\"width: 578px; height: 404px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> The water slide in the Aquatic and Recreation Center has been repainted. <\/div> <\/div> <\/div> <!-- close group --> <\/div> <!-- close row --> <div class=\"gallery-row\" style=\"width: 880px; height: 175px;\" data-original-width=\"880\" data-original-height=\"175\" > <div class=\"gallery-group images-1\" style=\"width: 261px; height: 175px;\" data-original-width=\"261\" data-original-height=\"175\" > <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/arc-renovations-20\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"257\"> <meta itemprop=\"height\" content=\"171\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32625\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1.jpg\" data-orig-size=\"900,599\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;5.6&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;ARC pool renovations, Power C, Thursday, May 14, 2020.&quot;,&quot;created_timestamp&quot;:&quot;1589451181&quot;,&quot;copyright&quot;:&quot;University of Tennesee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;24&quot;,&quot;iso&quot;:&quot;1600&quot;,&quot;shutter_speed&quot;:&quot;0.00625&quot;,&quot;title&quot;:&quot;ARC Renovations-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"ARC Renovations-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1-300x200.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1.jpg 900w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1-300x200.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1-768x511.jpg 768w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1-580x386.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1-610x406.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1-250x166.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction-1-600x400.jpg 600w\" width=\"257\" height=\"171\" loading=\"lazy\" data-original-width=\"257\" data-original-height=\"171\" itemprop=\"http:\/\/schema.org\/image\" title=\"ARC Renovations-20\" alt=\"A Power C is now painted to the floor of the pool in the Aquatic and Recreation Center.\" style=\"width: 257px; height: 171px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> A Power C is now painted to the floor of the pool in the Aquatic and Recreation Center. <\/div> <\/div> <\/div> <!-- close group --> <div class=\"gallery-group images-1\" style=\"width: 119px; height: 175px;\" data-original-width=\"119\" data-original-height=\"175\" > <div class=\"tiled-gallery-item tiled-gallery-item-small\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/arc-renovations-20-33\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"115\"> <meta itemprop=\"height\" content=\"171\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32645\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33.jpg\" data-orig-size=\"862,1280\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"ARC Renovations-20-33\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33-202x300.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33-690x1024.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33.jpg 862w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33-202x300.jpg 202w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33-690x1024.jpg 690w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33-768x1141.jpg 768w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33-1034x1536.jpg 1034w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33-580x861.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33-610x906.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33-135x200.jpg 135w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/ARC-Renovations-20-33-269x400.jpg 269w\" width=\"115\" height=\"171\" loading=\"lazy\" data-original-width=\"115\" data-original-height=\"171\" itemprop=\"http:\/\/schema.org\/image\" title=\"ARC Renovations-20-33\" alt=\"Paddleboards, kayaks, tents and other equipment is now available at the Aquatic and Recreation Center.\" style=\"width: 115px; height: 171px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> Paddleboards, kayaks, tents and other equipment is now available at the Aquatic and Recreation Center. <\/div> <\/div> <\/div> <!-- close group --> <div class=\"gallery-group images-1\" style=\"width: 261px; height: 175px;\" data-original-width=\"261\" data-original-height=\"175\" > <div class=\"tiled-gallery-item tiled-gallery-item-large\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/operation-move-in-20-2\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"257\"> <meta itemprop=\"height\" content=\"171\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32642\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18.jpg\" data-orig-size=\"900,599\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;5.6&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Students move into housing on Monday, Aug 10, 2020.&quot;,&quot;created_timestamp&quot;:&quot;1597051181&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;44&quot;,&quot;iso&quot;:&quot;250&quot;,&quot;shutter_speed&quot;:&quot;0.00125&quot;,&quot;title&quot;:&quot;Operation Move In-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Operation Move In-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18-300x200.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18.jpg 900w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18-300x200.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18-768x511.jpg 768w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18-580x386.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18-610x406.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18-250x166.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction18-600x400.jpg 600w\" width=\"257\" height=\"171\" loading=\"lazy\" data-original-width=\"257\" data-original-height=\"171\" itemprop=\"http:\/\/schema.org\/image\" title=\"Operation Move In-20\" alt=\"A new pedestrian walkway connects the West Campus Housing parking garage to Vine Street and Boling apartments&#039; sidewalks.\" style=\"width: 257px; height: 171px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> A new pedestrian walkway connects the West Campus Housing parking garage to Vine Street and Boling apartments&#8217; sidewalks. <\/div> <\/div> <\/div> <!-- close group --> <div class=\"gallery-group images-1\" style=\"width: 239px; height: 175px;\" data-original-width=\"239\" data-original-height=\"175\" > <div class=\"tiled-gallery-item tiled-gallery-item-small\" itemprop=\"associatedMedia\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"> <a href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/emcs-roof-20\/\" border=\"0\" itemprop=\"url\"> <meta itemprop=\"width\" content=\"235\"> <meta itemprop=\"height\" content=\"171\"> <img decoding=\"async\" class=\"\" data-attachment-id=\"32628\" data-orig-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction4.jpg\" data-orig-size=\"750,546\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;5.6&quot;,&quot;credit&quot;:&quot;Angela Foster&quot;,&quot;camera&quot;:&quot;NIKON Z 6&quot;,&quot;caption&quot;:&quot;Workers install a new roof on a portion of the EMCS building Wednesday, Aug 12, 2020&quot;,&quot;created_timestamp&quot;:&quot;1597248855&quot;,&quot;copyright&quot;:&quot;University of Tennessee at Chattanooga&quot;,&quot;focal_length&quot;:&quot;200&quot;,&quot;iso&quot;:&quot;125&quot;,&quot;shutter_speed&quot;:&quot;0.000625&quot;,&quot;title&quot;:&quot;EMCS Roof-20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"EMCS Roof-20\" data-image-description=\"\" data-medium-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction4-300x218.jpg\" data-large-file=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction4.jpg\" src=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction4.jpg\" srcset=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction4.jpg 750w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction4-300x218.jpg 300w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction4-580x422.jpg 580w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction4-610x444.jpg 610w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction4-250x182.jpg 250w, https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/Construction4-549x400.jpg 549w\" width=\"235\" height=\"171\" loading=\"lazy\" data-original-width=\"235\" data-original-height=\"171\" itemprop=\"http:\/\/schema.org\/image\" title=\"EMCS Roof-20\" alt=\"Roofing replacements have taken place at several campus buildings.\" style=\"width: 235px; height: 171px;\" \/> <\/a> <div class=\"tiled-gallery-caption\" itemprop=\"caption description\"> Roofing replacements have taken place at several campus buildings. <\/div> <\/div> <\/div> <!-- close group --> <\/div> <!-- close row --> <\/div>\n","protected":false},"excerpt":{"rendered":"<p>Several construction projects on campus are either finished, close to finishing or underway.<\/p>\n<p class=\"more-link-wrap\"><span><a class=\"more-link button text\" href=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/\"><span>Continue Reading <\/a><\/span><\/p>\n","protected":false},"author":1105,"featured_media":32640,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","_ef_editorial_meta_checkbox_slider":"","_ef_editorial_meta_checkbox_featurette":"","_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[15,59,57,821,64],"tags":[5007,785,70340,486,83559,37901],"class_list":{"0":"post-32617","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-campus","8":"category-college-of-engineering-and-computer-science","9":"category-college-of-business","10":"category-lupton-library","11":"category-news","12":"tag-aquatic-and-recreation-center","13":"tag-fine-arts-center","14":"tag-james-r-mapp","15":"tag-mckenzie-arena","16":"tag-state-office-building","17":"tag-west-campus-housing","18":"entry"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Improvements changing both the outward faces and interior spaces at UTC | UTC News Archive: Jul 2007 - Oct 2025<\/title>\n<meta name=\"description\" content=\"Several construction projects on campus are either finished, close to finishing or underway.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Improvements changing both the outward faces and interior spaces at UTC | UTC News Archive: Jul 2007 - Oct 2025\" \/>\n<meta property=\"og:description\" content=\"Several construction projects on campus are either finished, close to finishing or underway.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/\" \/>\n<meta property=\"og:site_name\" content=\"UTC News Archive: Jul 2007 - Oct 2025\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/UTChattanooga\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-08T13:35:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-09-30T13:39:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"525\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Shawn Ryan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@UTChattanooga\" \/>\n<meta name=\"twitter:site\" content=\"@UTChattanooga\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Shawn Ryan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/\"},\"author\":{\"name\":\"Shawn Ryan\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#\\\/schema\\\/person\\\/7c7532013925b3412f8142e378b04942\"},\"headline\":\"Improvements changing both the outward faces and interior spaces at UTC\",\"datePublished\":\"2020-09-08T13:35:19+00:00\",\"dateModified\":\"2020-09-30T13:39:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/\"},\"wordCount\":887,\"commentCount\":1,\"image\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/files\\\/2020\\\/08\\\/construction16.jpg\",\"keywords\":[\"Aquatic and Recreation Center\",\"Fine Arts Center\",\"james r. mapp\",\"McKenzie Arena\",\"state office building\",\"west campus housing\"],\"articleSection\":[\"Campus\",\"College of Engineering and Computer Science\",\"Gary W. Rollins College of Business\",\"Lupton Library\",\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/\",\"name\":\"Improvements changing both the outward faces and interior spaces at UTC | UTC News Archive: Jul 2007 - Oct 2025\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/files\\\/2020\\\/08\\\/construction16.jpg\",\"datePublished\":\"2020-09-08T13:35:19+00:00\",\"dateModified\":\"2020-09-30T13:39:47+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#\\\/schema\\\/person\\\/7c7532013925b3412f8142e378b04942\"},\"description\":\"Several construction projects on campus are either finished, close to finishing or underway.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/files\\\/2020\\\/08\\\/construction16.jpg\",\"contentUrl\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/files\\\/2020\\\/08\\\/construction16.jpg\",\"width\":750,\"height\":525,\"caption\":\"The water slide in the Aquatic and Recreation Center has been repainted.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/2020\\\/09\\\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Improvements changing both the outward faces and interior spaces at UTC\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/\",\"name\":\"UTC News Archive: Jul 2007 - Oct 2025\",\"description\":\"Official news releases of the University of Tennessee at Chattanooga\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/#\\\/schema\\\/person\\\/7c7532013925b3412f8142e378b04942\",\"name\":\"Shawn Ryan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g\",\"caption\":\"Shawn Ryan\"},\"description\":\"Shawn Ryan is the executive staff writer in the Office of Communications and Marketing at UTC.\",\"url\":\"https:\\\/\\\/blogarchive.utc.edu\\\/news\\\/author\\\/hqv743\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Improvements changing both the outward faces and interior spaces at UTC | UTC News Archive: Jul 2007 - Oct 2025","description":"Several construction projects on campus are either finished, close to finishing or underway.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Improvements changing both the outward faces and interior spaces at UTC | UTC News Archive: Jul 2007 - Oct 2025","og_description":"Several construction projects on campus are either finished, close to finishing or underway.","og_url":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/","og_site_name":"UTC News Archive: Jul 2007 - Oct 2025","article_publisher":"https:\/\/www.facebook.com\/UTChattanooga","article_published_time":"2020-09-08T13:35:19+00:00","article_modified_time":"2020-09-30T13:39:47+00:00","og_image":[{"width":750,"height":525,"url":"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg","type":"image\/jpeg"}],"author":"Shawn Ryan","twitter_card":"summary_large_image","twitter_creator":"@UTChattanooga","twitter_site":"@UTChattanooga","twitter_misc":{"Written by":"Shawn Ryan","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/#article","isPartOf":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/"},"author":{"name":"Shawn Ryan","@id":"https:\/\/blogarchive.utc.edu\/news\/#\/schema\/person\/7c7532013925b3412f8142e378b04942"},"headline":"Improvements changing both the outward faces and interior spaces at UTC","datePublished":"2020-09-08T13:35:19+00:00","dateModified":"2020-09-30T13:39:47+00:00","mainEntityOfPage":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/"},"wordCount":887,"commentCount":1,"image":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/#primaryimage"},"thumbnailUrl":"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg","keywords":["Aquatic and Recreation Center","Fine Arts Center","james r. mapp","McKenzie Arena","state office building","west campus housing"],"articleSection":["Campus","College of Engineering and Computer Science","Gary W. Rollins College of Business","Lupton Library","News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/","url":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/","name":"Improvements changing both the outward faces and interior spaces at UTC | UTC News Archive: Jul 2007 - Oct 2025","isPartOf":{"@id":"https:\/\/blogarchive.utc.edu\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/#primaryimage"},"image":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/#primaryimage"},"thumbnailUrl":"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg","datePublished":"2020-09-08T13:35:19+00:00","dateModified":"2020-09-30T13:39:47+00:00","author":{"@id":"https:\/\/blogarchive.utc.edu\/news\/#\/schema\/person\/7c7532013925b3412f8142e378b04942"},"description":"Several construction projects on campus are either finished, close to finishing or underway.","breadcrumb":{"@id":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/#primaryimage","url":"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg","contentUrl":"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg","width":750,"height":525,"caption":"The water slide in the Aquatic and Recreation Center has been repainted."},{"@type":"BreadcrumbList","@id":"https:\/\/blogarchive.utc.edu\/news\/2020\/09\/improvements-changing-both-the-outward-faces-and-interior-spaces-at-utc\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogarchive.utc.edu\/news\/"},{"@type":"ListItem","position":2,"name":"Improvements changing both the outward faces and interior spaces at UTC"}]},{"@type":"WebSite","@id":"https:\/\/blogarchive.utc.edu\/news\/#website","url":"https:\/\/blogarchive.utc.edu\/news\/","name":"UTC News Archive: Jul 2007 - Oct 2025","description":"Official news releases of the University of Tennessee at Chattanooga","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogarchive.utc.edu\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogarchive.utc.edu\/news\/#\/schema\/person\/7c7532013925b3412f8142e378b04942","name":"Shawn Ryan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fd3380969898eaf8c8a869d0a88ec19c46f2edd41319a7a40d9c63946c900aa9?s=96&d=mm&r=g","caption":"Shawn Ryan"},"description":"Shawn Ryan is the executive staff writer in the Office of Communications and Marketing at UTC.","url":"https:\/\/blogarchive.utc.edu\/news\/author\/hqv743\/"}]}},"featured_image_src":"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg","featured_image_src_square":"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg","author_info":{"display_name":"Shawn Ryan","author_link":"https:\/\/blogarchive.utc.edu\/news\/author\/hqv743\/"},"jetpack_featured_media_url":"https:\/\/blogarchive.utc.edu\/news\/files\/2020\/08\/construction16.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts\/32617","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/users\/1105"}],"replies":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/comments?post=32617"}],"version-history":[{"count":17,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts\/32617\/revisions"}],"predecessor-version":[{"id":33047,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/posts\/32617\/revisions\/33047"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/media\/32640"}],"wp:attachment":[{"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/media?parent=32617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/categories?post=32617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogarchive.utc.edu\/news\/wp-json\/wp\/v2\/tags?post=32617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}